Friday, June 24, 2011

Final Day of the L.A. Build

Darius brushes glue onto to dutch hinge. Final act of the build. For now.

The table has a faux tablecloth draping over the edge facing the audience. Actually, it's made of lauan (wood), and hinged to the edge of the table so that it can lift up vertically and become a layer of the ocean swells. It'll be painted trompe l'oeil to look like folds of a table cloth on this side, and on the underside, like ocean waves.

Cindy Darby and Dan Hurlin apply the dutch hinge (muslin soaked in glue).


Twin TV sets, created by Zach, for shadow scenes.  In progress.

DanRae is working on clothing Sharon.




No comments:

Post a Comment